1993 – 94
Construction of bridges and miscellaneous works on the Miraj-Londa section Reach V
Value: 374 Lakhs
Certified By: Miraj Maharashtra
1996 – 97
Construction of new BG single rail line track between Peddapalli-Karimnagar Reach-X
Value: 108 Lakhs
Certified By: C.A.O/C, S. C. Railway, Secunderabad
1998 – 99
Construction of a Gallery along the axis of the earth dam at the right flank of the Cheyyuru Project
Value: 93.83 Lakhs
Certified By: SE/CAD I.C.
1993 – 94
Conversion of BMO SC Section from MG to BG construction of new ROB 742&747 between Alwal & Cavalry Barracks and between Ammuguda
Value: 191 Lakhs
Certified By: S.C. Railway, Secunderabad
1997 – 98
Construction of ROB No. 95 as IX 45.00 M Skew PSC Girder at km 31/9-10 across NH-45 Perunbatur S. Rly, Chennai
Value: 98.15 Lakhs
Certified By: C.P.M. S.Railway, Chennai
2000 – 01
Construction of ROB at km 477/3-4 as 1-34-M span PSC+1X18-213+1X12.6 m RCC T beam in connection with formation By-Pass Road to Eluru town
Value: 229.64 Lakhs
Certified By: CE/SCR/SC
1997 – 98
Construction of NRBC km 50.00 to 51.00 (Part B) EWE
Value: 380.04 Lakhs
Certified By: EE/ NRBCD.NO.
1998 – 99
Construction of aqueduct at km 67.205 of SLBC across Halia river Nalgonda
Value: 619.92 Lakhs
Certified By: SE/ SLBC, NALGONDA
1999 – 2000
Construction of aqueduct at km 72.761 of SLBC across Kanagal river Nalgonda
Value: 456.57 Lakhs
Certified By: SE/ SLBC, NALGONDA
1999 – 2000
E.W.E & F.E from Km 66.820 to 67.74 and from 67.351 to km 67.805 of SLBC, Nalgonda
Value: 157.06 Lakhs
Certified By: SE/ SLBC, NALGONDA
2000 – 01
PJP Construction of aqueduct at km 47.714 on NTR canal Pebbair, Mahaboobnagar
Value: 130.51 Lakhs
Certified By: SE/PJP I&CAD PEBBAIR
2001 – 02
Construction of a high-level Bridge across Chekralamadugu in Km 0.00 to 0.40 at Rajampet, Kadapa.
Value: 88 Lakhs
Certified By: SE/R & B, RAJAMPET
2000 – 03
Construction of a high-level bridge across Pennar river at Km 5/6 to 6/6 at Kamapapuram
Value: 410 Lakhs
Certified By: CE/SCR/SC
2002 – 03
Improvement road from Km 16.80 to 19.00 and Km 131.50 to Km 139.80 of NH 7
Value: 64.03 Lakhs
Certified By: EE, NH Division, BANGALORE
2002 – 03
Providing C.C blocks bed adjustments at Annamaya Project Rajampet Kadapa District
Value: 86.02 Lakhs
Certified By: EE, Kadapa Circle, KADAPA
2001 – 02
Excavation of the Right Main canal from km 17.010 to km 19.840
Value: 107 Lakhs
Certified By: SE/ RAJAMPET
2002 – 03
Construction of NRBC Km 91 to 95 in KBJNL Arikara- Raichur District
Value: 1225.77 Lakhs
Certified By: EE, DEODURGA
2002 – 03
Construction of Sub-mercible Bridge at Khammam District
Value: 125 Lakhs
Certified By: EE, Kothagudem
2002 – 03
NSLC repairs to structures removal of deposited earth
Value: 113 Lakhs
Certified By: EE, KHAMMAM
2002 – 03
NSLC repairs to structures removal of deposited earth
Value: 118 Lakhs
Certified By: EE, KHAMMAM
2002 – 03
Construction of Footpath Bridge across Yanamanduru Drain in Bhimavaram
Value: 157.84 Lakhs
Certified By: EE, R&B Circle, Bhimavaram
2003 – 04
Excavation of Link canal from Km 0.00 to 0.40 and approach channel 250M of TGP Kadapa District
Value: 182.22 Lakhs
Certified By: EE, KADAPA
2003 – 05
Rebuilding of Bridge No. 579 across river Papagni in Kamalapuram in South Central Railway
Value: 1098.03 Lakhs
Certified By: CAO/C/SC/SEC
2003 – 05
Rehabilitation of Bridge No. 190 in LNL-Pune Section & Bridge No. 532 in Pune-Wadi Section
Value: 381.02 Lakhs
Certified By: Central Railway
2007 – 08
Construction of 4-lane HLB in Anantapur town. Km 0/4, Anantapur – Raichur Rd
Value: 240 Lakhs
Certified By: SE, R&B Circle, Anantapur
2008 – 12
Construction of high-level Rai Way bridge at Rajampeta in lieu of LC No:103
Value: 1280 Lakhs
Certified By: EE R&D , Rajampet, Kadapa
2004 – 08
Construction of HLB across Pennar bridge at Siddhoutam of Bhakarpet
Value: 1410.78 Lakhs
Certified By: EE, R&B Kadapa
2003 – 04
Tank formation across the local stream Buggapadu Khammam
Value: 44.03 Lakhs
Certified By: EE, KHAMMAM
2003 – 04
Construction of Chennamukkalapalli Head Regulator and Power Block
Value: 148.35 Lakhs
Certified By: EE, TGP Circle, KADAPA
2004 – 05
Earthwork excavation from Km 2.00 to Km 3.00 of Flood Flow canal from SRSP
Value: 286.35 Lakhs
Certified By: SE, SRSP FFC Circle, JAGITYAL
2004 – 05
Earthwork excavation from Km 3.00 to Km 4.00 of Flood Flow canal from SRSP
Value: 337.05 Lakhs
Certified By: SE, SRSP FFC Circle, JAGITYAL
2004 – 05
Construction of Bridge No. 76 in the Gadag-Solapur section
Value: 671.56 Lakhs
Certified By: S.W.RLY, BANGALORE
2005 – 06
Improvement to Nallamada drain from Km 2.60 to Km 21.20 in Guntur District
Value: 318.20 Lakhs
Certified By: SE, Irrigation Circle, GUNTUR
2004 – 05
Excavation of Tail race channel Reach II in PJHEP Revulaplli Gadwal Mahaboobnagar District
Value: 627.48 Lakhs
Certified By: APGENCO
2005 – 06
Excavation of Tail race channel Reach I in PJHEP Revulaplli Gadwal Mahaboobnagar District
Value: 181.10 Lakhs
Certified By: APGENCO
2005 – 06
Formation of Earth Dam of Yelluru Balancing Reservoir from Km 0.000 to 0.825 including Earth work excavation
Value: 635.66 Lakhs
Certified By: SE, NKLIS Circle, Mahaboobnagar
2003 – 06
Construction of Bridge No. 449/1 Tapti river on Bhushwal
Value: 729.22 Lakhs
Certified By: Central Railway
2006 – 07
Construction of HLB across Jurruru Vagu near Banaganapalli
Value: 110 Lakhs
Certified By: SE, R&B Circle, KURNOOL
2006 – 07
Formation of Approach Four Lane road from Hyderabad – Srisailam
Value: 591 Lakhs
Certified By: EE(R&B), Roads Division, HYDERABAD
2005 – 06
Formation of Earth Dam of Yelluru Balancing Reservoir from Km 0.975 to 1.680 including Earth work excavation
Value: 511.28 Lakhs
Certified By: SE, NKLIS Circle, Mahaboobnagar
2006 – 07
Construction of HLB across river Chitravathi in Km 33/0 to 33/8 of Pulivendula
Value: 624.97 Lakhs
Certified By: SE, R&B Circel, KADAPA
2006 – 07
Road from JK Road to Gangayanapalli via Satakovvuru. Construction of HLB across Mogameru
Value: 218.66 Lakhs
Certified By: SE, PR, KADAPA
2004 – 07
Formation of the Yelluru balancing reservoir from Km. 0.825 to Km. 0.975 and Km. 5.300 to Km. 6.000, Mahaboobnagar
Value: 714 Lakhs
Certified By: SE, NKLIS Circle, Mahaboobnagar
2006 – 07
Improvements (a) to Arthmur – Upputeru road from Km 0/0 to 23/78 (b) to Bhimavaram – Gusivada Kadiri road from Km 3/40 to 20/96
Value: 113.33 Lakhs
Certified By: SE, R&B, Eluru Circle, ELURU
2004 – 08
Construction of a High-Level Bridge across Taliperuvagu at Km. 48/8-10 of Bhadrachalam – Chandrupatla road in Khammam.
Value: 850 Lakhs
Certified By: EE, R&B division, Bhadrachalam
2005 – 08
TGP.Package.50 – Providing Lining TGP. Main canal from Km. 0.000 to 42.566.
Value: 3429.18 Lakhs
Certified By: SE, Irrigation Circle, Nandyal.
2008 – 11
Earthwork excavation approach canal, intake pul power house tail race channel
Value: 11294 Lakhs
Certified By: SE Apgenco Atmakur
2006 – 08
Construction of bridge No 118 nandayal yerraguntla section near PSC bridge
Value: 1394.62 Lakhs
Certified By: CE SC Railway Secunderabad
2009 – 12
Construction of ROB at Rayavaram Village in Lieu of L.C No.236 railway KM.143/10-12 of Guntur-Nandyal section
Value: 1405 Lakhs
Certified By: EE R&D , markapur
2005 – 07
Construction of HLB across River Chitravathi in KM33/0 to 33/8 of Pulivendula-Parnapalli road in Kadapa district
Value: 800 Lakhs
Certified By: SE R&D,kadapa